Commercial Solar Project
Southern, WI
Project Overview:
The Morse Group designed, built, and installed a 360-kilowatt parking shade structure with a 600-volt DC collection system for this design/build solar project.
Project Description:
Pre-project planning for this design/build project included conceptual layouts and budgeting. The Morse Group coordinated with architects and structural engineers to design the support system while our electrical engineers developed the collection system, monitoring, and utility interconnection point. The Morse Group determined all equipment specifications, procured materials, and completed the system installation and commissioning.